| CA |
Configuration Audits |
|
| CAP |
Control Account Plan(Cost Account Plan) |
控制会计计划书 |
| CAR |
Causal Analysis and Resolution |
原因分析与解决方案 |
| CBA |
IPI CMM-Based Appraisal for Internal Process Improvement |
|
| CCB |
Configuration Control Board |
|
| CCR |
Change Commitment Record |
|
| CDM |
Configuration and Data Management |
|
| CDR |
Critical Design Review |
关键设计评审 |
| CD&UT |
Coding and Unit Testing phase |
编码与单元测试阶段 |
| CI |
Configuration Item |
|
| CL |
Capability Level |
能力等级 |
| CM |
Configuration Management |
建构管理/配置管理/型态管理 |
| CMB |
Change Management Board |
|
| CMM |
Capability Maturity Model |
成熟度模型 |
| CMMI |
Capability Maturity Model Integration |
|
| CMU |
Carnegie Mellon University |
|
| CPC |
Computer Programming Manual |
|
| CPFF |
Cost Plus Fixed Fee Contract |
成本加固定报酬合约 |
| CPI |
Cost Performance Index CPI = BCWP/ACWP |
成本绩效指数
CPI= EV/AC |
| CPIF |
Cost Plus Incentive Fee Contract |
成本加奖金合约 |
| CPM |
Critical Path Method |
要径法 |
| CPU |
Central Processing Unit |
|
| CRISD |
Computer Resources Integrated Support Document |
|
| CRLCMP |
Computer Resource Life Cycle Management Plan |
计算机资源生命周期管理计画 |
| COSM |
Computer System Operator's Manual |
|
| CS |
Critical Software |
|
| CSC |
Computer Software Component |
|
| CSCI |
Computer Software Configuration Item |
|
| CSD |
Collaborative Software Development |
|
| CSU |
Computer Software Unit |
|
| CV |
Cost Variance CV= BCWP-ACWP |
成本变异 |
| CVS |
Concurrent Versions System |
|
| CWBS |
Contract Work Breakdown Structure |
|
| CWS |
Collaborative Workspace |
|
| IDD |
Interface Design Description |
接口设计描述 |
| IDS |
Interface Design Specification |
|
| IEEE |
The Institute of Electrical and Electronics Engineers, Inc. |
|
| IFB |
Invitation for Bid |
投标邀请函 |
| IMP |
Integrated Master Plan |
|
| IMS |
Integrated Master Schedule |
|
| IPD-CMM |
Integrated Product Development Capability Maturity Model |
|
| IPM |
Integrated Project Management |
整合的项目管理 |
| IPPD |
Integrated Product and Process Development |
|
| IPT |
Integrated Product Team |
|
| IS&AC |
Installation and Acceptance phase |
安装与验收阶段 |
| ISO |
International Organization for Standard |
|
| ISR |
Interim System Review |
|
| IT |
Integrated Teaming |
整合团队活动 |
| ITP |
Integration Test Plan |
|
| IT&ST |
Integrating and System Testing phase |
组装与系统测试阶段 |
| IVP |
Integration and Verification Plan |
|
| IVR |
Integration and Verification Report |
|
| IV&V |
Independent Verification and Validation |
独立验证与确认 |
| IWS |
Individual Workspace |
|
| PA |
Physical Audit |
|
| PB |
Product Baseline |
|
| PC |
Percent Complete |
完成百分比 |
| PCA |
Physical Configuration Audit |
|
| PCO |
Procedure Change Order |
|
| PD |
Preliminary Design Phase |
|
| PDD |
Preliminary Design Document |
|
| PDL |
Program Design Language |
|
| PDM |
Precedence Diagramming Method |
优先级图标法 |
| PDR |
Preliminary Design Review |
初步设计评审 |
| PERT |
Program Evaluation and Review Technique |
计画评核法 |
| PF |
Planned Finish Date |
计画完成日 |
| PI |
Product Integration |
产品整合 |
| PIP |
Project Implementation Plan |
|
| PLCS |
Product Life Cycle Support |
|
| PLM |
Product Lifecycle Management |
|
| PM |
Project Management /Project Manager |
|
| PMBOK |
Project Management Body of Knowledge |
|
| PMC |
Project Monitoring and Control |
项目监控 |
| PMI |
Project Management Institute |
|
| PMP |
Project Management Professional |
项目管理师(证照) |
| PP |
Project Planning |
项目规划 |
| PPB |
Preliminary Product Baseline PPB= Development Baseline (DB) |
|
| PP&O |
Project Planning and Oversight |
项目计画与监督 |
| PPQA |
Process and Product Quality Assurance |
流程与产品品质保证 |
| PR |
Problem Report |
|
| PRR |
Product Readiness Review |
产品准备就绪评审 |
| PS |
Planned Start Date |
计划开始日 |
| PSP |
Personal Software Process |
|
| PV |
Planned Value |
PV=BCWS |
| PVT |
Product Verification Test |
|
| PWBS |
Program Work Breakdown Structure |
|
| SADT |
Structured Analysis and Design Technique |
|
| SAM |
Supplier Agreement Management |
供货商协议管理 |
| SA&SD |
System Analysis and Software Definition phase |
系统分析与软件定义阶段 |
| SCAMPI |
Standard Appraisal Method for Process Improvement
( ) |
|
| SCE |
Software Capability Valuation |
|
| SCL |
Source Code Library |
|
| SCM |
Software Configuration Management |
软件配置(建构/型态)管理 |
| SCMP |
Software Configuration Management Plan |
软件配置(建构/型态)管理计画 |
| SCN |
Specification Change Notice |
|
| SCO |
Software Change Order |
|
| SD |
System Design |
|
| SDCE |
Software Development Capability Evaluation |
|
| SDD |
Software Design Document, Software Design Description |
软件设计文文件(分成概要设计说明书[PDD]和详细设计说明书[DDD]) |
| SDDD |
System/Segment Design Document |
|
| SDF |
Software Development File |
软件开发文件 |
| SDL |
Software Development Library |
软件开发库 |
| SDP |
Software Development Plan |
软件开发计画 |
| SDR |
System Design Review |
系统设计审查 |
| SEDS |
System Engineering Detailed Schedule |
|
| SEI |
Software Engineering Institute |
软件工程学会 |
| SEMS |
Systems Engineering Master Schedule |
|
| SEPG |
Software Engineering Process Group |
|
| SEPO |
Software Engineering Process Office |
软件工程流程办公室 |
| SF |
Scheduled Finish Date |
预定完成日 |
| SF |
Start-to-Finish |
开始到结束 |
| SFR |
System Functional Review |
|
| SG |
Specific Goal |
|
| SIOM |
Software Input/Output Manual |
|
| SIP |
Software Installation Plan |
|
| SIT |
System Integration Test |
|
| SLOC |
source lines of code |
|
| SOW |
Statement of Work |
工作说明 |
| SP |
Specific Practice |
|
| SPI |
Software Process Improvement |
|
| SPI |
Schedule Performance Index SPI=BCWP/BCWS |
时程绩效指数SPI=EV/PV |
| SPIN |
Software Process Improvement Network |
|
| SPM |
Software Program's Manual |
|
| SPMP |
Software Project Management Plan |
软件问题报告单 |
| SPR |
Software Problem Report |
|
| SPS |
Software Product Specification |
软件品质保证 |
| SQA |
Software Quality Assurance |
|
| SQAP |
Software Quality Assurance Plan |
软件品质保证计画 |
| SRD |
Software Requirement Document |
|
| SRR |
Software/System Requirement Review |
软件/系统需求审查 |
| SRS |
Software Requirement Specification |
软件需求规格说明 |
| SRSs |
Software Requirement Specifications |
|
| SS |
Start-to-Start |
开始到开始 |
| SSDD |
System/Subsystem Design Description |
系统/子系统设计描述 |
| SSR |
Software Specification Review |
软件规格说明审查 |
| SSS |
System/Subsystem Specification |
系统/子系统规格说明 |
| ST |
System Test |
|
| STD |
Software Transfer Document / Software Test Description |
|
| STP |
System/Software Test Plan |
|
| STR |
System/Software Test Report, Software Trouble Report |
|
| STrP |
Software Transition Plan |
|
| STSC |
Software Technology Support Center |
软件技术支持中心 |
| SUM |
Software User Manual |
用户手册 |
| SV |
Schedule Variance |
|
| SVD |
Software Version Description |
软件版本描述 |
| SVR |
System Verification Review |
|
| SVT |
System Verification Test |
|
| SVVP |
Software Verification and Validation Plan |
软件验证与确认计画 |
| SVVPR |
Software Verification and Validation Plan Review |
|
| SVVR |
Software Verification and Validation Review |
软件验证与确认评审 |
| SW 或 S/W |
Software |
|
| SWAP |
Software Action Plan |
|
| SW-CMM |
Capability Maturity Model for Software |
软件成熟度模型 |