| CA |
Configuration Audits |
|
| CAP |
Control Account Plan(Cost Account Plan) |
控制會計計劃書 |
| CAR |
Causal Analysis and Resolution |
原因分析與解決方案 |
| CBA |
IPI CMM-Based Appraisal for Internal Process Improvement |
|
| CCB |
Configuration Control Board |
|
| CCR |
Change Commitment Record |
|
| CDM |
Configuration and Data Management |
|
| CDR |
Critical Design Review |
關鍵設計評審 |
| CD&UT |
Coding and Unit Testing phase |
編碼與單元測試階段 |
| CI |
Configuration Item |
|
| CL |
Capability Level |
能力等級 |
| CM |
Configuration Management |
建構管理/配置管理/型態管理 |
| CMB |
Change Management Board |
|
| CMM |
Capability Maturity Model |
成熟度模型 |
| CMMI |
Capability Maturity Model Integration |
|
| CMU |
Carnegie Mellon University |
|
| CPC |
Computer Programming Manual |
|
| CPFF |
Cost Plus Fixed Fee Contract |
成本加固定報酬合約 |
| CPI |
Cost Performance Index CPI = BCWP/ACWP |
成本績效指數
CPI= EV/AC |
| CPIF |
Cost Plus Incentive Fee Contract |
成本加獎金合約 |
| CPM |
Critical Path Method |
要徑法 |
| CPU |
Central Processing Unit |
|
| CRISD |
Computer Resources Integrated Support Document |
|
| CRLCMP |
Computer Resource Life Cycle Management Plan |
電腦資源生命週期管理計畫 |
| COSM |
Computer System Operator's Manual |
|
| CS |
Critical Software |
|
| CSC |
Computer Software Component |
|
| CSCI |
Computer Software Configuration Item |
|
| CSD |
Collaborative Software Development |
|
| CSU |
Computer Software Unit |
|
| CV |
Cost Variance CV= BCWP-ACWP |
成本變異 |
| CVS |
Concurrent Versions System |
|
| CWBS |
Contract Work Breakdown Structure |
|
| CWS |
Collaborative Workspace |
|
| IDD |
Interface Design Description |
介面設計描述 |
| IDS |
Interface Design Specification |
|
| IEEE |
The Institute of Electrical and Electronics Engineers, Inc. |
|
| IFB |
Invitation for Bid |
投標邀請函 |
| IMP |
Integrated Master Plan |
|
| IMS |
Integrated Master Schedule |
|
| IPD-CMM |
Integrated Product Development Capability Maturity Model |
|
| IPM |
Integrated Project Management |
整合的專案管理 |
| IPPD |
Integrated Product and Process Development |
|
| IPT |
Integrated Product Team |
|
| IS&AC |
Installation and Acceptance phase |
安裝與驗收階段 |
| ISO |
International Organization for Standard |
|
| ISR |
Interim System Review |
|
| IT |
Integrated Teaming |
整合團隊活動 |
| ITP |
Integration Test Plan |
|
| IT&ST |
Integrating and System Testing phase |
組裝與系統測試階段 |
| IVP |
Integration and Verification Plan |
|
| IVR |
Integration and Verification Report |
|
| IV&V |
Independent Verification and Validation |
獨立驗證與確認 |
| IWS |
Individual Workspace |
|
| PA |
Physical Audit |
|
| PB |
Product Baseline |
|
| PC |
Percent Complete |
完成百分比 |
| PCA |
Physical Configuration Audit |
|
| PCO |
Procedure Change Order |
|
| PD |
Preliminary Design Phase |
|
| PDD |
Preliminary Design Document |
|
| PDL |
Program Design Language |
|
| PDM |
Precedence Diagramming Method |
優先順序圖示法 |
| PDR |
Preliminary Design Review |
初步設計評審 |
| PERT |
Program Evaluation and Review Technique |
計畫評核法 |
| PF |
Planned Finish Date |
計畫完成日 |
| PI |
Product Integration |
產品整合 |
| PIP |
Project Implementation Plan |
|
| PLCS |
Product Life Cycle Support |
|
| PLM |
Product Lifecycle Management |
|
| PM |
Project Management /Project Manager |
|
| PMBOK |
Project Management Body of Knowledge |
|
| PMC |
Project Monitoring and Control |
專案監控 |
| PMI |
Project Management Institute |
|
| PMP |
Project Management Professional |
專案管理師(證照) |
| PP |
Project Planning |
專案規劃 |
| PPB |
Preliminary Product Baseline PPB= Development Baseline (DB) |
|
| PP&O |
Project Planning and Oversight |
專案計畫與監督 |
| PPQA |
Process and Product Quality Assurance |
流程與產品品質保證 |
| PR |
Problem Report |
|
| PRR |
Product Readiness Review |
產品準備就緒評審 |
| PS |
Planned Start Date |
計劃開始日 |
| PSP |
Personal Software Process |
|
| PV |
Planned Value |
PV=BCWS |
| PVT |
Product Verification Test |
|
| PWBS |
Program Work Breakdown Structure |
|
| SADT |
Structured Analysis and Design Technique |
|
| SAM |
Supplier Agreement Management |
供應商協議管理 |
| SA&SD |
System Analysis and Software Definition phase |
系統分析與軟體定義階段 |
| SCAMPI |
Standard Appraisal Method for Process Improvement
( ) |
|
| SCE |
Software Capability Valuation |
|
| SCL |
Source Code Library |
|
| SCM |
Software Configuration Management |
軟體配置(建構/型態)管理 |
| SCMP |
Software Configuration Management Plan |
軟體配置(建構/型態)管理計畫 |
| SCN |
Specification Change Notice |
|
| SCO |
Software Change Order |
|
| SD |
System Design |
|
| SDCE |
Software Development Capability Evaluation |
|
| SDD |
Software Design Document, Software Design Description |
軟體設計文檔(分成概要設計說明書[PDD]和詳細設計說明書[DDD]) |
| SDDD |
System/Segment Design Document |
|
| SDF |
Software Development File |
軟體開發文件 |
| SDL |
Software Development Library |
軟體開發庫 |
| SDP |
Software Development Plan |
軟體開發計畫 |
| SDR |
System Design Review |
系統設計審查 |
| SEDS |
System Engineering Detailed Schedule |
|
| SEI |
Software Engineering Institute |
軟體工程學會 |
| SEMS |
Systems Engineering Master Schedule |
|
| SEPG |
Software Engineering Process Group |
|
| SEPO |
Software Engineering Process Office |
軟體工程流程辦公室 |
| SF |
Scheduled Finish Date |
預定完成日 |
| SF |
Start-to-Finish |
開始到結束 |
| SFR |
System Functional Review |
|
| SG |
Specific Goal |
|
| SIOM |
Software Input/Output Manual |
|
| SIP |
Software Installation Plan |
|
| SIT |
System Integration Test |
|
| SLOC |
source lines of code |
|
| SOW |
Statement of Work |
工作說明 |
| SP |
Specific Practice |
|
| SPI |
Software Process Improvement |
|
| SPI |
Schedule Performance Index SPI=BCWP/BCWS |
時程績效指數SPI=EV/PV |
| SPIN |
Software Process Improvement Network |
|
| SPM |
Software Program's Manual |
|
| SPMP |
Software Project Management Plan |
軟體問題報告單 |
| SPR |
Software Problem Report |
|
| SPS |
Software Product Specification |
軟體品質保證 |
| SQA |
Software Quality Assurance |
|
| SQAP |
Software Quality Assurance Plan |
軟體品質保證計畫 |
| SRD |
Software Requirement Document |
|
| SRR |
Software/System Requirement Review |
軟體/系統需求審查 |
| SRS |
Software Requirement Specification |
軟體需求規格說明 |
| SRSs |
Software Requirement Specifications |
|
| SS |
Start-to-Start |
開始到開始 |
| SSDD |
System/Subsystem Design Description |
系統/子系統設計描述 |
| SSR |
Software Specification Review |
軟體規格說明審查 |
| SSS |
System/Subsystem Specification |
系統/子系統規格說明 |
| ST |
System Test |
|
| STD |
Software Transfer Document / Software Test Description |
|
| STP |
System/Software Test Plan |
|
| STR |
System/Software Test Report, Software Trouble Report |
|
| STrP |
Software Transition Plan |
|
| STSC |
Software Technology Support Center |
軟體技術支援中心 |
| SUM |
Software User Manual |
用戶手冊 |
| SV |
Schedule Variance |
|
| SVD |
Software Version Description |
軟體版本描述 |
| SVR |
System Verification Review |
|
| SVT |
System Verification Test |
|
| SVVP |
Software Verification and Validation Plan |
軟體驗證與確認計畫 |
| SVVPR |
Software Verification and Validation Plan Review |
|
| SVVR |
Software Verification and Validation Review |
軟體驗證與確認評審 |
| SW 或 S/W |
Software |
|
| SWAP |
Software Action Plan |
|
| SW-CMM |
Capability Maturity Model for Software |
軟體成熟度模型 |